Salinas River Diversion Facility

CB Cut-Off Wall across Salinas River, Marina, CA

Installation of a High Strength CB Cut-Off Wall across the Salinas River as a foundation support for an inflatable dam

Approximate Depths of 50 feet, length of 400 feet. High groundwater conditions.

Multiple elevation changes

Tight schedule with multiple simultaneous operations

Strength requirement of 300 psi in 28 days Installation of H-Beams into alignment of wall Average Strength Result of 535 psi in 28 day

Installation of a High Strength CB Cut-Off Wall across the Salinas River as a foundation support for an inflatable dam

Approximate Depths of 50 feet, length of 400 feet. High groundwater conditions.

Multiple elevation changes

Tight schedule with multiple simultaneous operations

Strength requirement of 300 psi in 28 days Installation of H-Beams into alignment of wall Average Strength Result of 535 psi in 28 day

Diavik Diamond Mine

Plastic Concrete Cut-Off Wall in constructed dikes

Lac de Gras, Northwest Territory, Canada

Excavation under bentonite slurry by hydraulic clamshell and hydromill along dike alignment

Slurry Pipeline to and from excavations

Bentonite Hydration and Recycle Pond

Clamshell excavation of panel under bentonite slurry

Desanding Plant for Hydromill bentonite slurry recycling

Open pit excavation, where a lake once was

Slurry Engineering
Slurry Engineering
Slurry Engineering
Slurry Engineering
Slurry Engineering
Slurry Engineering

San Andreas Reservoir

Cement-Bentonite annular fill for pipeline

replacement at 70 feet water depth

Pumping through 2-inch hose to submerged structure

Mixing bentonite slurry, adding slag cement

Transfer mix to agitator holding tank